Custom Home Building Timeline: What Happens Month by Month
At Ace Construction of Louisiana, we know that building your dream home isn’t just a project. It’s one of the most significant milestones in your life. That’s why we’re more than just builders. We’re partners in the journey, guiding you through every phase with care, clarity, and a deep understanding of what it takes to create a home that truly feels like yours.
And we’re proud to say our clients feel that difference.
“Ace Construction is the best around. They put their heart and soul into every project they create. They are truly on your side and want to make your dreams come to life. Highly recommend!”
- K. Fortenberry
That kind of trust doesn’t happen by accident. It comes from listening, showing up, and helping you feel confident at every step. From the first blueprint to move-in day, we’re with you.
With the right plan in place,
building a custom home transforms from an intimidating process into an exciting journey, especially when you know what to expect at every turn.
Month 1: Designing and Planning Your Custom Home in Livingston Parish
Every great home begins with a solid plan. This is where we sit down together to discuss your vision, goals, and how you want your home to work for you and your family. We take your ideas and help shape them into a design that fits your life, both now and in the future. While you focus on the fun decisions, like layout and style, we handle the behind-the-scenes details to keep your build on track.
Here’s what happens during this phase:
- Finalizing your home design with a custom layout
- Selecting your lot if it hasn’t already been chosen
- Securing permits and parish approvals
- Confirming the scope of work and setting the build timeline
Month 2 and 3: Pouring the Foundation for a New Home
Once the necessary approvals are secured, we will begin preparing your property for construction. This part of the process sets the stage for everything that follows. By the end of this phase, your new home will be standing on a strong, well-built foundation.
This phase includes:
- Clearing and grading the land for stability
- Installing forms and steel rebar for reinforcement
- Pouring the slab foundation with precision
- Completing initial site inspections to ensure everything meets code
Month 4 and 5: Home Framing, Roofing, and Rough-In Work Explained
This is when your house really starts to feel real. You’ll see the frame take shape, rooflines appear, and the overall structure of your home come to life. We also run plumbing, HVAC, and electrical systems that will eventually be hidden behind the walls.
During these months, we focus on:
- Framing the whole structure, including roof lines
- Installing exterior doors and energy-efficient windows
- Running rough-in plumbing, ductwork, and electrical wiring
- Applying sheathing, roofing, and waterproofing materials
Month 6: Home Inspections and Insulation
Before the walls are closed up, we pause for essential inspections. These inspections confirm that every part of your home’s internal systems meets parish codes. Once those are complete, we install insulation to help regulate temperatures and improve energy efficiency.
At this stage, you can expect:
- Parish inspections for electrical, HVAC, and plumbing systems
- Installing spray foam or batt insulation in walls and attic
- Sealing the home and prepping interior walls for drywall installation
Month 7 and 8: Drywall and Interior Installation Process
With the structure finished and insulation in place, it’s time for your home’s interior to come together. This is when your style really starts showing through. Walls go up, paint is applied, and your chosen materials begin to bring each room to life.
Key interior steps include:
- Hanging and finishing drywall for a smooth surface
- Applying texture and interior paint colors
- Installing floors, baseboards, crown molding, and other trim
- Fitting custom cabinetry and countertops in kitchens and bathrooms
Month 9: Final Steps Before Moving Into a Custom Home
As we approach the finish line, we take care of the final details and make sure every part of your home is ready for you. We complete a detailed walkthrough with you to confirm that everything meets your expectations before move-in day.
Final preparations include:
- Installing light fixtures, plumbing fixtures, and appliances
- Completing final grading and landscaping, if included in the scope
- Performing a detailed punch list and deep interior cleaning
- Walking through the home with you to ensure everything is ready
At Ace Construction, building a custom home in Livingston Parish is about more than just the finished product. It’s about giving you peace of mind throughout the entire experience. From that first meeting to the final walkthrough, we’re here to help you build a home you’ll love for years to come.
Contact us today to start building the home your family has been waiting for.